CWA — A Member of Norda Stelo — will be attending the Ports Canada 2024 Conference next week in Port Alberni, BC from September 17-19.
Connect with Daniel Chadwick — Structural Engineer and Project Manager at CWA-Norda Stelo with expertise in structural designs for marine and material handling environments — to discuss our latest projects and recent developments in the ports and terminals sector.
Daniel has been involved with numerous ports and terminals projects including recent upgrades at Neptune Bulk Terminals, Westshore Terminals, and DP Worlds’s Fraser Surrey Docks. He has been integral to CWA’s coastal and First Nations projects for the past 7 years, including the Coastal Vulnerability Studies, a multi-year project to assess the high-level impacts of climate change-induced sea level rise, storm surges, and tsunamis to coastal First Nations communities throughout British Columbia.
Publications:
D. Chadwick, H. Baktash, S. Yee, and G. Andrew, “Designing Conveyors for Large Seismic Induced Displacements at a Port Facility,” presented at PORTS’22 in Honolulu, HI, USA, Sept. 18-21, 2022.
D. Chadwick, A. Giesbrecht, N. Clark, H. Mir, and N. Allyn, “Understanding Flooding Hazzards Posed to Coastal Infrastructure from Extreme Ocean-Driven Events,” presented at PORTS’19 in Pittsburgh, PA, USA, Sept. 15-19, 2019.