Shiploader Spill Containment Pans

CWA was commissioned by Kinder Morgan to design a fully-enclosed, self-cleaning containment pan system at Berth 4 of the Vancouver Wharves site to reduce product spillage, allow for product recycling, and mitigate potential environmental risks.

Ingo/Outgo Dumper Systems Upgrade

Project Details: Ridley Terminals Inc. (RTI) has been one of North America’s leading coal export terminals for nearly 40 years. In order to meet current and future throughput demands, RTI planned to replace aging equipment within their railcar unloading facility. CWA was retained by RTI as the prime consultant responsible for the engineering, procurement, and… Read More

Spy Hill Aggregate Plant

Project details Lafarge Canada Inc.’s Spy Hill aggregate plant is an automated high-capacity screening, crushing, and washing plant that can crush approximately 1,000 tons per hour and was approximately 700 tons per hour. As the prime engineering consultant, CWA was responsible for the civil, structural, mechanical, and electrical detailed design along with establishing and controlling… Read More

​Ready-Mix Harbour Plant

​Project details CWA was retained by Lafarge Canada Inc. (Lafarge) as the prime consultant responsible for engineering, procurement, and construction management services for a new ready-mix facility in Vancouver, British Columbia. The project included the following elements: A barge berth designed to accommodate 6,000-tonne barges. A 1,400 t/h barge unloading and stacking conveyor system. Aggregate… Read More

​Coal Capacity Upgrade

Project details CWA provided EPCM services to Neptune Bulk Terminals to increase the capacity of its metallurgical (steel-making) coal export facility from 8.5 million tonnes per year to 12.5 million tonnes per year. The project included the installation of a new stacker/reclaimer and a related conveyor system rated at 8,000 tonnes per hour. Challenges As… Read More