Equipment Fatigue Analysis

Project details: Trigon Pacific Terminals Ltd. (formerly, Ridley Terminals Inc. (RTI)) operates a bulk materials handling terminal, located at Prince Rupert’s Ridley Island, for the export of metallurgical coal, thermal coal, petroleum coke. CWA was retained by RTI to conduct a fatigue analysis and service life prediction of their major materials handling equipment, including two… Read More

Wet Milling Facility Inspection & Repairs

Project details: CWA was engaged by Agrium Inc. (now Nutrien Limited) to conduct a review of the existing mill structure in the wet milling facility at their potash mine in Vanscoy, Saskatchewan. Following the inspection, CWA was asked to perform the conceptual and detailed design and provide construction support services for a retrofit of the… Read More

Cement Terminal Inspections

Project details: In order to mitigate safety and quality risks and prevent catastrophic incidents, Lafarge Canada Inc. (Lafarge) has implemented a program to inspect and monitor key assets at their cement terminals, quarries, and other manufacturing facilities. Under the program, Lafarge engaged CWA to perform inspections of 15 cement terminals throughout western Canada and northwestern… Read More

​Richmond Terminal Marine Infrastructure Rehabilitation

​Project details CWA was initially engaged by Lafarge Canada Inc. (Lafarge) to perform a load capacity analysis of two existing timber structures, an approach trestle and a portion of the main wharf, to identify their safe working load capacity. As part of the analysis, CWA performed a site visit and condition inspection to identify repairs… Read More

​Landside/Seaside Grain Terminal Inspection

​Project Details The Cargill grain terminal in North Vancouver, British Columbia handles wheat, durum, canola, barley, and grain by-products. CWA was engaged to complete an inspection of the terminal to help ensure that it was in a safe structural condition and that there was safe access for personnel working in the facility. Challenges The inspection… Read More

​Rail Beam Assessment & Rehabilitation

​Project details After conducting a condition inspection of one of the berths at Neptune Bulk Terminals (NBT) that found exposed and corroded pre-stressed strands on one of the rail beams, CWA designed and implemented a temporary steel splice plate repair that would allow the berth to safely continue operations while a permanent repair was developed…. Read More

Red Dog Lightering Barges Maintenance Review

​Project details The Red Dog mine, one of the largest zinc mines in the world, uses two lightering barges to transport zinc and lead concentrates from the port facility to ocean-going bulk carrier vessels at deep-water offshore anchorage. CWA was engaged to carry out an inspection of the material handling equipment, including a self-unloading belt… Read More

​Structural Maintenance Strategy Audit

Project details Cerrejón owns the largest open-pit coal mine and export port in Latin America, which have a capacity of over 32 million tonnes per year and are connected by a 150-kilometre-long railroad. Cerrejón had established structural inspection and maintenance procedures for their mine, railway, and port infrastructure and wanted to bring their system in… Read More