Project details
CWA was engaged by Canadian Forest Products (Canfor) to provide engineering and project management for a new wood chip unloading system at its pulp mill in Prince George, British Columbia.
Solutions
CWA provided engineering and project management for the wood chip unloading system including a 125-ton combination railcar/truck dumper and an outstocking conveyor system. The conveyor system was equipped with a uniquely-designed offloading station to offload wood chips at a high turnover rate.
CWA also assisted Canfor with procurement and the installation of the new facilities.