​Project details CWA was retained to design the offloading and process conveyor systems for Vale-Inco’s Long Harbour limestone and nickel concentrate processing facility. The systems are comprised of 15 separate conveyors totalling 1,400 metres in length, including: A 602-metre fully-enclosed tubular offloading conveyor from the wharf to the storage building. A 114-metre tripper conveyor including… Read More